Papakura to Drury State Highway 1 - Stage 1

Asset Construction were proud to be a part of the developements of the construction of NZTA's key transport improvement project Papakura to Drury Stage 1 - in conjunction with Fulton Hogan. ACL scope of works included excavations of trenches and joint bays, preparation and installation of new service ducts for power supply, signals communications, lamps and posts. We laid 2000m of pipe in a mix of 50-150mm diameter with multiple trench details, depths and sizes, and were present on site from September 2022 - September 2023.