Asset construction have completed Park West with Hawkins. The project boasts several complex disciplines. ACL have installed basalt stone set paving to the front of the building, bespoke furniture, accoya boardwalks, hoggin breakout areas with planting and lawns for students plus a series of complex retaining walls, as well as the civils and excavation. The result is a stunning piece of open space for students, uninterrupted indoor outdoor flow and overall a really cool and well thought out design.