Blue Moon Subdivision, Langs Beach

70 lot subdivision located at Langs Beach, 115kms north of Auckland. This project includes 35,000m3 of steep grade earthworks requiring significant preliminary enabling works such as a 3000m2 granular drainage blanket, vertical wick drains to underside of drainage blanket and erosion and sediment control ponds with flocculant dosing sheds, 3 waters infrastructure, a stormwater wetland treatment area, and a 200m long 5m high keystone retaining wall intended to be the feature component of the finished development. The project is currently 70% complete as at May 2018, with an expected completion in early November. The project is tracking well to programme and budget, even with the very wet summer, and wet start to winter. This is an excellent example of ACL’s ability to phase works in a manner that ensures year round productivity.