Part of the Waterview Interchange Project, the contract consisted of the construction of a timber boardwalk across a tidal estuary. Programming phases of work around tidal movements was critical to the overall success of the project.
A gabion wall constructed to repair scouring and erosion of the stream bank. The works included difficult site access through private property.
A subdivision project consisting of 9 lots. The works included substantial retaining walls, approximately 1500m2 of concrete road and accessways, kerb and channel, earthworks and drainage.   Completion Objectives:
Construction of a reinforced concrete retaining wall with drilled support piles into rock, with a stone veneer.