Part of the Waterview Interchange Project, the contract consisted of the construction of a timber boardwalk across a tidal estuary. Programming phases of work around tidal movements was critical to the overall success of the project.
Projects
A gabion wall constructed to repair scouring and erosion of the stream bank.
The works included difficult site access through private property.
A subdivision project consisting of 9 lots.
The works included substantial retaining walls, approximately 1500m2 of concrete road and accessways, kerb and channel, earthworks and drainage.
Completion Objectives:
Construction of a reinforced concrete retaining wall with drilled support piles into rock, with a stone veneer.
- « first
- ‹ previous
- 1
- 2
- 3
- 4